Pontiac MidPoint-Brokaw substation interconnection queue
1 active project totaling 26 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Pontiac MidPoint-Brokaw as the point of interconnection, all in Livingston County, IL.
Target commercial operation dates as filed run from Dec 2019 to Feb 2023 (2 filings).
1active projects
26active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-106 | Pontiac MidPoint-Brokaw 345kV | 345 | 106.4 | Solar | Withdrawn | Feb 2023 |
| Z2-087 | Bright Stalk Generating Facility | 345 | 26 | Wind | In Service | Dec 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Livingston County, IL
- Pontiac - Dresden: 2 active, 438.6 MW of 2 filed
- McLean: 4 active, 264 MW of 5 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Powerton - Goodings Grove: 1 active, 80 MW of 2 filed
- Powerton-Goodings Grove: 2 active, 79.5 MW of 4 filed
- Loretto: 1 active, 50 MW of 4 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Pontiac Midpoint: none active of 4 filed
- Loretto-Wilton Center: none active of 3 filed
- Dresden-Pontiac Midpoint: none active of 2 filed
- Pontiac Midpoint-Dresden: none active of 2 filed
- Tazewell-Kendall: none active of 2 filed