Pontiac - Dresden substation interconnection queue

2 active projects totalling 438.6 MW in the PJM queue.

2active projects
438.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2184 Pontiac - Dresden 345 kV 345 288.6 Solar Active
C01-2189 Pontiac - Dresden 345 kV 345 150 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.