Pontiac - Dresden substation interconnection queue
2 active projects totaling 438.6 MW in the PJM queue.
2 PJM queue filings name Pontiac - Dresden as the point of interconnection, all in Livingston County, IL.
Target commercial operation date as filed: May 2030 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (2 filings).
2active projects
438.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2184 | Pontiac - Dresden 345 kV | 345 | 288.6 | Solar | Active | May 2030 |
| C01-2189 | Pontiac - Dresden 345 kV | 345 | 150 | Battery | Active | May 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Livingston County, IL
- McLean: 4 active, 264 MW of 5 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Powerton - Goodings Grove: 1 active, 80 MW of 2 filed
- Powerton-Goodings Grove: 2 active, 79.5 MW of 4 filed
- Loretto: 1 active, 50 MW of 4 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Pontiac MidPoint-Brokaw: 1 active, 26 MW of 2 filed
- Pontiac Midpoint: none active of 4 filed
- Loretto-Wilton Center: none active of 3 filed
- Dresden-Pontiac Midpoint: none active of 2 filed
- Pontiac Midpoint-Dresden: none active of 2 filed
- Tazewell-Kendall: none active of 2 filed