Powerton - Goodings Grove substation interconnection queue
1 active project totalling 80 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
80active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1704 | Powerton - Goodings Grove 345 kV | 345 | 80 | Wind | Active |
| C01-1705 | Powerton - Goodings Grove 345 kV | 345 | 40 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.