Sulphur Creek-Loretto substation interconnection queue

1 active project totalling 23.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
23.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-298 Sulphur Creek-Loretto 69 kV 69 23.3 Solar Active
AG2-512 Sulphur Creek-Loretto 69 kV 69 11 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.