Sulphur Creek-Loretto substation interconnection queue
1 active project totalling 23.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
23.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-298 | Sulphur Creek-Loretto 69 kV | 69 | 23.3 | Solar | Active |
| AG2-512 | Sulphur Creek-Loretto 69 kV | 69 | 11 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.