Substation Scout

Chestertown substation interconnection queue

1 active project totalling 19.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
19.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
AB2-133 Morgnec Road Solar 69 19.8 Solar Partially in Service - Under Construction
AB1-133 Chestertown 69kV 69 14 Solar Withdrawn
X3-074 Chestertown 69kV 69 4.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.