Chestertown substation interconnection queue
1 active project totaling 19.8 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Chestertown as the point of interconnection, all in MD.
Target commercial operation dates as filed run from Mar 2013 to Jul 2026 (3 filings).
1active projects
19.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-133 | Morgnec Road Solar | 69 | 19.8 | Solar | In Service | Jul 2026 |
| AB1-133 | Chestertown 69kV | 69 | 14 | Solar | Withdrawn | Nov 2016 |
| X3-074 | Chestertown 69kV | 69 | 4.5 | Solar | Withdrawn | Mar 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | AB2-133 | Status change | n/a | Partially in Service - Under Construction → In Service |
Other PJM queue substations in Kent County, MD
Other PJM queue substations in Somerset County, MD
- Loretto: 1 active, 50 MW of 4 filed
- Kings Creek: none active of 6 filed
- Crisfield: none active of 4 filed
- Costen: 2 active, 0 MW of 3 filed
- North Salisbury: none active of 3 filed
- Kings Creek-Crisfield: none active of 2 filed