Substation Scout

Kings Creek-Crisfield substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W4-017 Kings Creek-Crisfield 69kV 69 13 Wind Withdrawn
AA2-130 CleanBay Biomass Generator 69 2 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.