Kings Creek-Crisfield substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Kings Creek-Crisfield as the point of interconnection, all in Somerset County, MD.
Target commercial operation dates as filed run from Dec 2013 to Sep 2018 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W4-017 | Kings Creek-Crisfield 69kV | 69 | 13 | Wind | Withdrawn | Dec 2013 |
| AA2-130 | CleanBay Biomass Generator | 69 | 2 | Gas | Withdrawn | Sep 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Somerset County, MD
- Loretto: 1 active, 50 MW of 4 filed
- Chestertown: 1 active, 19.8 MW of 3 filed
- Kings Creek: none active of 6 filed
- Crisfield: none active of 4 filed
- Costen: 2 active, 0 MW of 3 filed
- North Salisbury: none active of 3 filed