Cedar Creek substation interconnection queue

1 active project totalling 50 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
50active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI2-089 Cedar Creek 138 kV 138 71 Solar Withdrawn
C01-1990 Cedar Creek 138 kV 138 50 Solar Active
AG2-446 Cedar Creek 138 kV 138 25.3 Solar Withdrawn
AC1-095 Cedar Creek 25kV 25 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.