Hay Road substation interconnection queue
1 active project totaling 13 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Hay Road as the point of interconnection, all in New Castle County, DE.
Target commercial operation dates as filed run from May 2010 to Jun 2018 (3 filings).
1active projects
13active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X1-074 | Edge Moor Units EM6, EM7; Hay Road Units 5,6,7,8 | 230 | 291 | Gas | Withdrawn | Jun 2018 |
| AA1-033 | Hay Road 230kV | 230 | 80 | Gas | Withdrawn | Jun 2018 |
| T51 | Hay Road Units 1, 2, 3, 4 | n/r | 13 | Gas | In Service | May 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in New Castle County, DE
- Red Lion: 3 active, 588.3 MW of 5 filed
- Cartanza: 1 active, 309.2 MW of 7 filed
- Motiva: 2 active, 202 MW of 2 filed
- Reybold: 4 active, 93.6 MW of 7 filed
- Edgemoor: 7 active, 53.2 MW of 11 filed
- Cedar Creek: 1 active, 50 MW of 4 filed
- Townsend: 1 active, 37.6 MW of 3 filed
- Cedar Creek I: 2 active, 15.1 MW of 2 filed
- Cedar Creek II: 2 active, 15.1 MW of 2 filed
- Laurel-Sussex: 2 active, 8 MW of 3 filed
- Kent-Harrington: 2 active, 8 MW of 2 filed
- Delaware City: 1 active, 7.3 MW of 2 filed
- New Castle: none active of 4 filed
- Hawkins Gate / Oak Grove: none active of 2 filed