New Castle substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
A23 New Castle 138 kV 138 257 Gas Withdrawn
AF1-089 New Castle 69 kV 69 53.6 Hybrid Withdrawn
AH2-411 New Castle 69 kV 69 18 Hybrid Withdrawn
AH2-410 New Castle 69 kV 69 12 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.