Edgemoor substation interconnection queue
7 active projects totalling 53.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).
7active projects
53.2active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H16 | Edgemoor | n/r | 565 | Gas | Withdrawn |
| J03 | Edgemoor | n/r | 565 | Gas | Withdrawn |
| A57 | Unit 1 | n/r | 30 | Gas | Withdrawn |
| D02 | Hay Road 1-4 | n/r | 10 | Gas | In Service |
| H12 | Hay Road 4 | 230 | 10 | Gas | In Service |
| N05 | Hay Road 1-3 | 138 | 9 | Gas | In Service |
| N04 | Edgemoor 230kV | 230 | 8 | Gas | Withdrawn |
| N03 | Hay Road 2 | 69 | 7 | Gas | In Service |
| O10 | Hay Road 1-3 | 138 | 7 | Gas | In Service |
| T68 | Edgemoor #10 | n/r | 5.2 | Other | In Service |
| S03 | Edgemoor #5 | 230 | 5 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.