Townsend substation interconnection queue
1 active project totalling 37.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
37.6active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-179 | New Castle Solar | 138 | 37.6 | Solar | In Service |
| AB2-182 | Townsend 25kV | 25 | 14 | Solar | Withdrawn |
| W3-086 | Townsend 138kV | 138 | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.