atlantic, NJ interconnection queue

1 active project totaling 300 MW in the PJM queue.

1active projects
300active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-1465 Dorothy - Lewis 138 kV 138 300 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.