Substation Scout

atlantic, NJ interconnection queue

1 active project totalling 300 MW in the PJM queue.

1active projects
300active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-1465 Dorothy - Lewis 138 kV 138 300 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.