Dorothy - Lewis 138 kV
PJM queue ID C01-1465
Dorothy - Lewis 138 kV (C01-1465) is listed in the PJM interconnection queue as a 300 MW battery project in atlantic County, NJ. The filing names Dorothy - Lewis as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 1, 2031.
| Queue ID | C01-1465 |
|---|---|
| Project name | Dorothy - Lewis 138 kV |
| Status (as published) | Active |
| Substation | Dorothy - Lewis |
| Point of interconnection | Dorothy - Lewis 138 kV |
| County | atlantic |
| State | NJ |
| Voltage | 138 kV |
| Capacity | 300 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2031-09-01 |
| Source dataset | cycle |
Same substation and county
Dorothy - Lewis substation: 3 requests in the PJM queue, 1 active totaling 300 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-070 | Dorothy - Lewis 138 kV | 150 | Battery | Withdrawn |
| AI2-071 | Dorothy - Lewis 138 kV | 150 | Battery | Withdrawn |
atlantic, NJ: 1 request in the PJM queue, 1 active totaling 300 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Origis Development, LLC |
|---|---|
| Transmission owner | AEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 300.0 |
| MW capacity | 300.0 |
| MFO | 300.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/2/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.