Substation Scout

Dorothy - Lewis 138 kV

PJM queue ID C01-1465

Dorothy - Lewis 138 kV (C01-1465) is listed in the PJM interconnection queue as a 300 MW battery project in atlantic County, NJ. The filing names Dorothy - Lewis as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 1, 2031.

Queue IDC01-1465
Project nameDorothy - Lewis 138 kV
Status (as published)Active
SubstationDorothy - Lewis
Point of interconnectionDorothy - Lewis 138 kV
Countyatlantic
StateNJ
Voltage138 kV
Capacity300 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-09-01
Source datasetcycle

Same substation and county

Dorothy - Lewis substation: 3 requests in the PJM queue, 1 active totaling 300 MW.

Queue IDProjectMWResourceStatus
AI2-070Dorothy - Lewis 138 kV150BatteryWithdrawn
AI2-071Dorothy - Lewis 138 kV150BatteryWithdrawn

atlantic, NJ: 1 request in the PJM queue, 1 active totaling 300 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperOrigis Development, LLC
Transmission ownerAEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy300.0
MW capacity300.0
MFO300.0
Submitted date4/27/2026
Last updated6/2/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.