Substation Scout

Burlington (L&D Solar) 26kV

PJM queue ID Y3-026

Burlington (L&D Solar) 26kV (Y3-026) is listed in the PJM interconnection queue as a 3.8 MW solar project in Burlington County, NJ. The filing names Burlington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 24, 2015.

Queue IDY3-026
Project nameBurlington (L&D Solar) 26kV
Status (as published)In Service
SubstationBurlington
Point of interconnectionBurlington 26kV
CountyBurlington
StateNJ
Voltage26 kV
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2015-09-24
Source datasetserial

Same substation and county

Burlington substation: 24 requests in the PJM queue, 8 active totaling 450.1 MW.

Queue IDProjectMWResourceStatus
C01-1269Burlington 230 kV250BatteryActive
B09ABurlington168GasIn Service
G17Burlington #1016GasIn Service
W3-080Cedar Lane5.7SolarIn Service
Y3-048Burlington Generating Station3GasIn Service
W4-103North American Solar2.7SolarIn Service
AF1-261North American Solar0.9SolarIn Service
G11Burlington 138kV622GasWithdrawn
B09bBurlington 138kV336GasWithdrawn
G12Burlington 230kV316GasWithdrawn
AH2-127Burlington 26 kV18BatteryWithdrawn
W2-060Florence solar7.6SolarWithdrawn

11 more on the substation page.

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

A substation with the same name is named in PJM transmission planning materials: Burlington (PSEG, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy10
MW capacity3.8
MFO10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first