Burlington 230 kV

PJM queue ID C01-1269

Burlington 230 kV (C01-1269) is listed in the PJM interconnection queue as a 250 MW battery project in Burlington County, NJ. The filing names Burlington as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 2, 2029.

Queue IDC01-1269
Project nameBurlington 230 kV
Status (as published)Active
SubstationBurlington
Point of interconnectionBurlington 230 kV
CountyBurlington
StateNJ
Voltage230 kV
Capacity250 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-04-02
Source datasetcycle

Same substation and county

Burlington substation: 24 requests in the PJM queue, 8 active totaling 450.1 MW.

Queue IDProjectMWResourceStatus
B09ABurlington168GasIn Service
G17Burlington #1016GasIn Service
W3-080Cedar Lane5.7SolarIn Service
Y3-026Burlington (L&D Solar) 26kV3.8SolarIn Service
Y3-048Burlington Generating Station3GasIn Service
W4-103North American Solar2.7SolarIn Service
AF1-261North American Solar0.9SolarIn Service
G11Burlington 138kV622GasWithdrawn
B09bBurlington 138kV336GasWithdrawn
G12Burlington 230kV316GasWithdrawn
AH2-127Burlington 26 kV18BatteryWithdrawn
W2-060Florence solar7.6SolarWithdrawn

11 more on the substation page.

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

A substation with the same name is named in PJM transmission planning materials: Burlington (PSEG, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLighthouse Burlington, LLC
Transmission ownerPSEG
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy250.0
MW capacity250.0
MFO250.0
Submitted date4/27/2026
Last updated8/6/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first