Burlington
PJM queue ID B09A
Burlington (B09A) is listed in the PJM interconnection queue as a 168 MW gas project in Burlington County, NJ. PJM lists its status as “In Service”, with a target commercial operation date of July 22, 2000.
| Queue ID | B09A |
|---|---|
| Project name | Burlington |
| Status (as published) | In Service |
| Substation | Burlington |
| Point of interconnection | Burlington 138kV |
| County | Burlington |
| State | NJ |
| Voltage | 138 kV |
| Capacity | 168 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2000-07-22 |
| Source dataset | serial |
Same substation and county
Burlington substation: 24 requests in the PJM queue, 8 active totaling 450.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1269 | Burlington 230 kV | 250 | Battery | Active |
| G17 | Burlington #10 | 16 | Gas | In Service |
| W3-080 | Cedar Lane | 5.7 | Solar | In Service |
| Y3-026 | Burlington (L&D Solar) 26kV | 3.8 | Solar | In Service |
| Y3-048 | Burlington Generating Station | 3 | Gas | In Service |
| W4-103 | North American Solar | 2.7 | Solar | In Service |
| AF1-261 | North American Solar | 0.9 | Solar | In Service |
| G11 | Burlington 138kV | 622 | Gas | Withdrawn |
| B09b | Burlington 138kV | 336 | Gas | Withdrawn |
| G12 | Burlington 230kV | 316 | Gas | Withdrawn |
| AH2-127 | Burlington 26 kV | 18 | Battery | Withdrawn |
| W2-060 | Florence solar | 7.6 | Solar | Withdrawn |
11 more on the substation page.
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
A substation with the same name is named in PJM transmission planning materials: Burlington (PSEG, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 168 |
| MW capacity | 168 |
| MFO | 168 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.