Burlington

PJM queue ID B09A

Burlington (B09A) is listed in the PJM interconnection queue as a 168 MW gas project in Burlington County, NJ. PJM lists its status as “In Service”, with a target commercial operation date of July 22, 2000.

Queue IDB09A
Project nameBurlington
Status (as published)In Service
SubstationBurlington
Point of interconnectionBurlington 138kV
CountyBurlington
StateNJ
Voltage138 kV
Capacity168 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2000-07-22
Source datasetserial

Same substation and county

Burlington substation: 24 requests in the PJM queue, 8 active totaling 450.1 MW.

Queue IDProjectMWResourceStatus
C01-1269Burlington 230 kV250BatteryActive
G17Burlington #1016GasIn Service
W3-080Cedar Lane5.7SolarIn Service
Y3-026Burlington (L&D Solar) 26kV3.8SolarIn Service
Y3-048Burlington Generating Station3GasIn Service
W4-103North American Solar2.7SolarIn Service
AF1-261North American Solar0.9SolarIn Service
G11Burlington 138kV622GasWithdrawn
B09bBurlington 138kV336GasWithdrawn
G12Burlington 230kV316GasWithdrawn
AH2-127Burlington 26 kV18BatteryWithdrawn
W2-060Florence solar7.6SolarWithdrawn

11 more on the substation page.

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

A substation with the same name is named in PJM transmission planning materials: Burlington (PSEG, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy168
MW capacity168
MFO168

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first