Beverly substation interconnection queue

2 active projects totalling 41 MW in the PJM queue.

2active projects
41active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-719 Beverly 345 kV 345 21 Gas Active
S35 Washington Energy Facility 345 20 Coal In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.