Beverly substation interconnection queue
2 active projects totaling 41 MW in the PJM queue.
2 PJM queue filings name Beverly as the point of interconnection, all in Washington County, OH.
Target commercial operation dates as filed run from Jun 2007 to Jun 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-719 | Washington Energy Facility | 345 | 21 | Gas | EP | Jun 2027 |
| S35 | Washington Energy Facility | 345 | 20 | Coal | In Service | Jun 2007 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Beverly (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-07 | AH1-719 | Status change | n/a | Active → EP |
Other PJM queue substations in Washington County, OH
- Washington: 3 active, 53.3 MW of 3 filed