Washington Energy Facility
PJM queue ID AA2-141
Washington Energy Facility (AA2-141) is listed in the PJM interconnection queue as a 45 MW gas project in Washington County, OH. The filing names Washington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 31, 2016.
| Queue ID | AA2-141 |
|---|---|
| Project name | Washington Energy Facility |
| Status (as published) | In Service |
| Substation | Washington |
| Point of interconnection | Washington 345kV |
| County | Washington |
| State | OH |
| Voltage | 345 kV |
| Capacity | 45 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2016-08-31 |
| Source dataset | serial |
Same substation and county
Washington substation: 3 requests in the PJM queue, 3 active totaling 53.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA1-014 | Washington Energy Facility | 5 | Gas | In Service |
| W3-044 | McCullough Road Solar Farm | 3.3 | Solar | In Service |
Washington, OH: 14 requests in the PJM queue, 7 active totaling 180.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 45 |
| MW capacity | 45 |
| MFO | 670 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.