Washington, OH interconnection queue
7 active projects totalling 180.5 MW in the PJM queue, plus 7 with terminal status (shown greyed).
7active projects
180.5active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD1-090 | Muskingum River 345 kV Phase I | 345 | 1,180 | Gas | Withdrawn |
| AD1-091 | Muskingum River 345 kV Phase II | 345 | 590 | Gas | Withdrawn |
| AH1-449 | Muskingum River - Sporn 345 kV | 345 | 150 | Hybrid | Withdrawn |
| Z2-112 | Waterford 345kV | 345 | 64.5 | Gas | In Service |
| X4-003 | Mill Creek-Riverview 138kV | 138 | 56 | Gas | Withdrawn |
| AA2-141 | Washington Energy Facility | 345 | 45 | Gas | In Service |
| AH1-719 | Beverly 345 kV | 345 | 21 | Gas | Active |
| S35 | Washington Energy Facility | 345 | 20 | Coal | In Service |
| T164 | Muskingum River #5 | n/r | 15 | Coal | In Service |
| R87 | Muskingum River #5 | n/r | 10 | Coal | In Service |
| Z2-032 | Clean River Power MR-1 (Devola) | n/r | 5.2 | Hydro | Withdrawn |
| Z2-033 | Clean River Power MR-2 (Lowell) | n/r | 5.2 | Hydro | Withdrawn |
| AA1-014 | Washington Energy Facility | 345 | 5 | Gas | In Service |
| Z2-034 | Clean River Power MR-3 (Beverly) | n/r | 4 | Hydro | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.