Midtown Thermal Control Center
PJM queue ID V3-036
Midtown Thermal Control Center (V3-036) is listed in the PJM interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in Atlantic County, NJ. The filing names Ontario as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2011.
| Queue ID | V3-036 |
|---|---|
| Project name | Midtown Thermal Control Center |
| Status (as published) | In Service |
| Substation | Ontario |
| Point of interconnection | Ontario 23kV |
| County | Atlantic |
| State | NJ |
| Voltage | 23 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2011-12-01 |
| Source dataset | serial |
Same substation and county
Ontario substation: 6 requests in the PJM queue, 2 active totaling 7.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| I01 | Jersey Atlantic WF | 7.5 | Wind | In Service |
| AF2-025 | Missouri Avenue Battery Storage Project | 8 | Battery | Withdrawn |
| K29 | Ontario | 1.5 | Wind | Withdrawn |
| AB1-177 | Ontario 23kV | 0 | Battery | Withdrawn |
| AD1-019 | Ontario 23 kV | 0 | Gas | Withdrawn |
Atlantic, NJ: 93 requests in the PJM queue, 12 active totaling 301.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5.5 |
| MW capacity | 0 |
| MFO | 5.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.