Queue IDProjectkVMWResourceStatus
C01-2224 Handsome Lake 345 kV 345 466 Gas Active
AA1-045 McConnellsburg-Guilford 138kV 138 308 Gas Withdrawn
B43 Homer City-Wayne 345kV 345 284 Gas Withdrawn
C01-2051 Grandview 115 kV 115 280 Battery Active
C01-2133 Handsome Lake - Armstrong 345 kV 345 250 Battery Active
AI1-181 Grandview 115 kV 115 140 Battery Withdrawn
C01-1545 Utica Junction 115 kV 115 110 Hybrid Active
AF1-304 Titusville-Grandview 115 kV 115 60 Hybrid Withdrawn
AE1-169 Titusville 115 kV 115 51 Solar Withdrawn
AF2-164 Handsome Lake 345 kV 345 48 Solar Withdrawn
AH1-050 Eclipse-Piney 115 kV 115 30 Solar Withdrawn
AH1-158 Eclipse-Piney 115 kV III 115 30 Battery Withdrawn
S34 Handsome Lake 345 20 Gas In Service
AH1-051 Eclipse-Piney 115 kV II 115 18 Solar Withdrawn
AG2-420 Eclipse #2 34.5 kV 34.5 14 Hybrid Active
AE1-160 Titusville Solar 34.5 12.7 Solar Withdrawn
AF2-166 Long Bridge 34.5 12 Solar Withdrawn
AF2-165 Cardinal Solar 34.5 11.3 Solar In Service
AF2-243 Pearl Solar 34.5 9 Solar Withdrawn
AI2-058 Clark Summit-Emlenton 34.5 kV 34.5 7.3 Solar Withdrawn
AI2-310 Emlenton 34.5 kV II 34.5 7.3 Solar Withdrawn
AI2-057 Venango 34.5 kV 34.5 6.6 Solar Withdrawn
AI1-164 Clark Summit - Tionesta Junction 34.5 kV 34.5 6.4 Solar Withdrawn
AG1-193 Foster Run 34.5 6 Solar Withdrawn
AI2-312 Clark Summit 34.5 kV II 34.5 5.5 Solar Withdrawn
AH2-355 Emlenton - Clark Summit 34.5 kV 34.5 5 Solar Withdrawn
AG1-139 Clark Summit-Emlenton 34.5 kV 34.5 4.8 Solar Withdrawn
AF2-089 Titusville 34.5 kV 34.5 3.3 Solar Withdrawn
AG2-038 Boyers DP 25 kV 25 3 Solar Withdrawn
W3-114 Venango I n/r 0.8 Solar Withdrawn
W3-115 Venango II n/r 0.8 Solar Withdrawn
W3-116 Venango III n/r 0.8 Solar Withdrawn
W3-118 Venango IV n/r 0.8 Solar Withdrawn
W3-119 Venango V n/r 0.8 Solar Withdrawn
X1-035 Piney 34.5kV I 34.5 0.8 Solar Withdrawn
X1-036 Piney 34.5kV II 34.5 0.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.