McConnellsburg substation interconnection queue

1 active project totalling 48.1 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
48.1active MW
6total filed
Queue IDProjectkVMWResourceStatus
AE1-132 McConnellsburg 138 kV 138 51 Solar Withdrawn
AC1-211 McConnellsburg 138kV 138 48.1 Solar Withdrawn
AD2-009 Great Cover Solar LLC 138 48.1 Solar In Service
AI2-297 McConnellsburg 138 kV 138 18.4 Solar Withdrawn
AF2-116 Great Cove Solar 138 13.3 Solar Withdrawn
W4-042 Cove Creek Solar Project 34.5 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.