Venango substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Venango as the point of interconnection, all in Venango County, PA.

Target commercial operation dates as filed run from Feb 2024 to Dec 2024 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-160 Titusville Solar 34.5 12.7 Solar Withdrawn Dec 2024
AI2-057 Venango 34.5 kV 34.5 6.6 Solar Withdrawn Feb 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Venango County, PA

All 36 PJM queue filings in Venango County, PA.