Utica Junction substation interconnection queue
1 active project totaling 110 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Utica Junction as the point of interconnection, all in Venango County, PA.
Target commercial operation dates as filed run from Aug 2026 to Jun 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PENELEC (1 filing).
1active projects
110active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1545 | Utica Junction 115 kV | 115 | 110 | Hybrid | Active | Jun 2030 |
| AG1-193 | Foster Run | 34.5 | 6 | Solar | Withdrawn | Aug 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Venango County, PA
- Handsome Lake: 1 active, 466 MW of 2 filed
- Emlenton: 1 active, 18 MW of 4 filed
- Clark Summit-Emlenton: 1 active, 11.3 MW of 3 filed
- McConnellsburg-Guilford: none active of 5 filed
- Grandview: none active of 3 filed
- Titusville: none active of 3 filed
- Venango: none active of 2 filed