Utica Junction substation interconnection queue

1 active project totaling 110 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Utica Junction as the point of interconnection, all in Venango County, PA.

Target commercial operation dates as filed run from Aug 2026 to Jun 2030 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PENELEC (1 filing).

1active projects
110active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1545 Utica Junction 115 kV 115 110 Hybrid Active Jun 2030
AG1-193 Foster Run 34.5 6 Solar Withdrawn Aug 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Venango County, PA

All 36 PJM queue filings in Venango County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first