Utica Junction substation interconnection queue

1 active project totalling 110 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
110active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1545 Utica Junction 115 kV 115 110 Hybrid Active
AG1-193 Foster Run 34.5 6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.