Titusville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-169 Titusville 115 kV 115 51 Solar Withdrawn
A53 Titusville n/r 25 Gas Withdrawn
AF2-089 Titusville 34.5 kV 34.5 3.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.