Titusville substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-169 | Titusville 115 kV | 115 | 51 | Solar | Withdrawn |
| A53 | Titusville | n/r | 25 | Gas | Withdrawn |
| AF2-089 | Titusville 34.5 kV | 34.5 | 3.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.