Handsome Lake substation interconnection queue

1 active project totalling 466 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
466active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2224 Handsome Lake 345 kV 345 466 Gas Active
AF2-164 Handsome Lake 345 kV 345 48 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.