Substation Scout

Grandview substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-2051 Grandview 115 kV 115 280 Battery Withdrawn
AI1-181 Grandview 115 kV 115 140 Battery Withdrawn
AC2-119 Grandview 138kV 138 17.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.