Grandview substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2018 to Apr 2031 (3 filings).
Transmission owner as filed: PENELEC (1 filing).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2051 | Grandview 115 kV | 115 | 280 | Battery | Withdrawn | Apr 2031 |
| AI1-181 | Grandview 115 kV | 115 | 140 | Battery | Withdrawn | Dec 2027 |
| AC2-119 | Grandview 138kV | 138 | 17.5 | Solar | Withdrawn | Dec 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-2051 | Terminal status | 280 | Active → Withdrawn |
Other PJM queue substations in Venango County, PA
- Handsome Lake: 1 active, 466 MW of 2 filed
- Utica Junction: 1 active, 110 MW of 2 filed
- Emlenton: 1 active, 18 MW of 4 filed
- Clark Summit-Emlenton: 1 active, 11.3 MW of 3 filed
- McConnellsburg-Guilford: none active of 5 filed
- Titusville: none active of 3 filed
- Venango: none active of 2 filed
Other PJM queue substations in Raliegh County, WV
- Grandview-Clifftop: none active of 2 filed