Home / PJM / substation / Grandview
Grandview substation interconnection queue
0 active projects
totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0 active projects
0 active MW
3 total filed
Queue ID Project kV MW Resource Status
C01-2051
Grandview 115 kV
115
280
Battery
Withdrawn
AI1-181
Grandview 115 kV
115
140
Battery
Withdrawn
AC2-119
Grandview 138kV
138
17.5
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.