Emlenton substation interconnection queue
1 active project totaling 18 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Emlenton as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Jul 2015 to Aug 2026 (4 filings).
1active projects
18active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Z1-105 | Emlenton 34.5kV | 34.5 | 19.9 | Gas | Withdrawn | Jul 2015 |
| AC1-011 | Emlenton 34.5kV | 34.5 | 18 | Gas | Withdrawn | Jan 2018 |
| AE1-123 | Clarion Boards | 34.5 | 18 | Gas | In Service | Nov 2023 |
| AF2-166 | Long Bridge | 34.5 | 12 | Solar | Withdrawn | Aug 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Clarion County, PA
- Burma - Armstrong: 1 active, 200 MW of 2 filed
- Erie East: none active of 6 filed
- Sligo: none active of 4 filed
- Burma: none active of 2 filed
- Clarion: none active of 2 filed
- Wolfs Corners: none active of 2 filed
Other PJM queue substations in Venango County, PA
- Handsome Lake: 1 active, 466 MW of 2 filed
- Utica Junction: 1 active, 110 MW of 2 filed
- Clark Summit-Emlenton: 1 active, 11.3 MW of 3 filed
- McConnellsburg-Guilford: none active of 5 filed
- Grandview: none active of 3 filed
- Titusville: none active of 3 filed
- Venango: none active of 2 filed