Sabinsville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-433 Sabinsville 115 kV 115 21 Solar Withdrawn
AC2-077 Sabinsville 34.5kV 34.5 20 Gas Withdrawn
AH1-230 Sabinsville 34.5kV 34.5 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.