Mainesburg substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Mainesburg as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Jun 2022 to Dec 2023 (3 filings).
Transmission owner as filed: PENELEC (1 filing).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-411 | Mainesburg 345 kV | 345 | 300 | Battery | Withdrawn | Jun 2023 |
| AF2-412 | Mainesburg 115 kV | 115 | 100 | Battery | Withdrawn | Jun 2022 |
| AH1-394 | Mainesburg 115 kV | 115 | 4 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Clinton County, PA
- Moshannon-East Towanda: none active of 4 filed
Other PJM queue substations in Tioga County, PA
- Warfordsburg: 1 active, 12 MW of 2 filed
- Mansfield: none active of 4 filed
- Sabinsville: none active of 3 filed
- Tower Hill: none active of 3 filed