Tower Hill substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Tower Hill as the point of interconnection, all in Tioga County, PA.
Target commercial operation dates as filed run from Jun 2020 to Dec 2023 (3 filings).
Transmission owner as filed: PENELEC (1 filing).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AA2-120 | Tower Hill 115kV | 115 | 250 | Gas | Withdrawn | Jun 2020 |
| AH1-160 | ASD Warner PA2 Solar LLC | 34.5 | 13.3 | Solar | Withdrawn | Nov 2023 |
| AG2-613 | Tower Hill 34.5 kV | 34.5 | 4.5 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Tioga County, PA
- Warfordsburg: 1 active, 12 MW of 2 filed
- Mansfield: none active of 4 filed
- Mainesburg: none active of 3 filed
- Sabinsville: none active of 3 filed
Site Scanner