Tower Hill substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-120 | Tower Hill 115kV | 115 | 250 | Gas | Withdrawn |
| AH1-160 | ASD Warner PA2 Solar LLC | 34.5 | 13.3 | Solar | Withdrawn |
| AG2-613 | Tower Hill 34.5 kV | 34.5 | 4.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.