Substation Scout

Tower Hill substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA2-120 Tower Hill 115kV 115 250 Gas Withdrawn
AH1-160 ASD Warner PA2 Solar LLC 34.5 13.3 Solar Withdrawn
AG2-613 Tower Hill 34.5 kV 34.5 4.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.