Tower Hill substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Tower Hill as the point of interconnection, all in Tioga County, PA.

Target commercial operation dates as filed run from Jun 2020 to Dec 2023 (3 filings).

Transmission owner as filed: PENELEC (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA2-120 Tower Hill 115kV 115 250 Gas Withdrawn Jun 2020
AH1-160 ASD Warner PA2 Solar LLC 34.5 13.3 Solar Withdrawn Nov 2023
AG2-613 Tower Hill 34.5 kV 34.5 4.5 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Tioga County, PA

All 21 PJM queue filings in Tioga County, PA.