Braidwood-East Frankfort substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-096 | Braidwood-East Frankfort 345 kV | 345 | 180 | Solar | Withdrawn |
| AE2-307 | Braidwood-East Frankfort | n/r | 165 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.