Wilmington-Davis Creek substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-241 | Wilmington-Davis Creek | n/r | 150 | Solar | Withdrawn |
| AE2-310 | Wilmington-Davis Creek | n/r | 67 | Hybrid | Withdrawn |
| AE2-049 | Wilmington-Davis Creek | n/r | 46 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.