Substation Scout

Wilmington-Davis Creek substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-241 Wilmington-Davis Creek n/r 150 Solar Withdrawn
AE2-310 Wilmington-Davis Creek n/r 67 Hybrid Withdrawn
AE2-049 Wilmington-Davis Creek n/r 46 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.