Wilmington substation interconnection queue

1 active project totalling 15.9 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
15.9active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-478 Wilmington Solar Energy Project 34.5 15.9 Hybrid Engineering and Procurement
V3-013 Wilmington 69kV 69 7.6 Solar Withdrawn
W4-033 Lincoln Solar n/r 3.8 Solar Withdrawn
AC1-032 Wilmington n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.