Davis Creek - Bloom substation interconnection queue
1 active project totalling 342 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
342active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2086 | Davis Creek - Bloom 345 kV | 345 | 342 | Battery | Active |
| AH2-363 | Davis Creek - Bloom 345 kV | 345 | 200 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.