Chicago Heights substation interconnection queue

1 active project totalling 250 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
250active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1334 Chicago Heights 138kV 138 kV 138 250 Battery Active
AH1-616 Chicago Heights 138 kV 138 150 Battery Withdrawn
AI1-155 Chicago Heights 138kV 138 110 Battery Withdrawn
O12 Geneva Energy LLC 138 20 Other Deactivated
AC1-169 Chicago Heights n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.