Chicago Heights substation interconnection queue
1 active project totalling 250 MW in the PJM queue, plus 4 with terminal status (shown greyed).
1active projects
250active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1334 | Chicago Heights 138kV 138 kV | 138 | 250 | Battery | Active |
| AH1-616 | Chicago Heights 138 kV | 138 | 150 | Battery | Withdrawn |
| AI1-155 | Chicago Heights 138kV | 138 | 110 | Battery | Withdrawn |
| O12 | Geneva Energy LLC | 138 | 20 | Other | Deactivated |
| AC1-169 | Chicago Heights | n/r | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.