Wilton Center substation interconnection queue

1 active project totalling 100 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
100active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1456 Wilton Center 345kV 345 kV 345 100 Battery Active
AD2-142 Wilton Center n/r 52.8 Wind Withdrawn
AD2-140 Wilton Center n/r 26.4 Wind Withdrawn
AD2-141 Wilton Center n/r 26.3 Wind Withdrawn
AD2-139 Wilton Center n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.