Substation Scout

Aurora substation interconnection queue

4 active projects totaling 100 MW in the PJM queue.

4 PJM queue filings name Aurora as the point of interconnection, all in IL.

Target commercial operation dates as filed run from Dec 2020 to Jun 2028 (4 filings). 1 active filing targets a date after November 27, 2026.

4active projects
100active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-111 Aurora Generation 138 36 Gas In Service Dec 2020
AC1-109 Aurora Generation 345 30 Gas In Service Dec 2020
AC1-110 Aurora Generation 138 30 Gas In Service Aug 2023
AG1-513 Aurora Battery Storage 138 4 Battery Suspended Jun 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Aurora (COMED, 2 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in Du Page County, IL

No other substation in Du Page County, IL is named as a point of interconnection in the PJM queue.

All 6 PJM queue filings in Du Page County, IL.

Other PJM queue substations in Will County, IL

All 66 PJM queue filings in Will County, IL.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first