Substation Scout

Givens-Mechanicsburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-305 Hillclimber Solar 138 46.8 Solar Withdrawn
AF1-054 Hillclimber Solar 138 23.1 Solar Withdrawn
AF1-053 Hillclimber Solar 138 16 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.