Mechanicsburg - Darby substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Mechanicsburg - Darby as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Dec 2019 to May 2025 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-539 | Mechanicsburg - Darby 138 kV | 138 | 48 | Solar | Withdrawn | May 2025 |
| R52 | Buckeye Wind Farm - Phase 1 | n/r | 40 | Wind | Withdrawn | Dec 2019 |
| AH1-195 | Mechanicsburg - Darby 138 kV | 138 | 30 | Solar | Withdrawn | Sep 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Union County, OH
- Bergen: 12 active, 1,192.4 MW of 22 filed
- Marysville: 4 active, 280.8 MW of 9 filed
- Blue Jacket-Kirby: 1 active, 96.4 MW of 3 filed
- Eagle Road: none active of 3 filed
- Honda Marysville Tap: none active of 3 filed
- Marysville-Tangy: none active of 2 filed
Other PJM queue substations in Champaign County, OH
- East Lima-Marysville: 3 active, 89.5 MW of 6 filed
- East Sidney-Quincy: 3 active, 86.4 MW of 5 filed
- Kings Creek: none active of 6 filed
- Givens-Mechanicsburg: none active of 3 filed
- West Mingo: none active of 3 filed
- Woodstock: none active of 3 filed
- Givens - Mechanicsburg: none active of 2 filed
- Mechanicsburg: none active of 2 filed
Site Scanner