Mechanicsburg - Darby substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-539 Mechanicsburg - Darby 138 kV 138 48 Solar Withdrawn
R52 Buckeye Wind Farm - Phase 1 n/r 40 Wind Withdrawn
AH1-195 Mechanicsburg - Darby 138 kV 138 30 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.