Mechanicsburg - Darby substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Mechanicsburg - Darby as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Dec 2019 to May 2025 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-539 Mechanicsburg - Darby 138 kV 138 48 Solar Withdrawn May 2025
R52 Buckeye Wind Farm - Phase 1 n/r 40 Wind Withdrawn Dec 2019
AH1-195 Mechanicsburg - Darby 138 kV 138 30 Solar Withdrawn Sep 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Union County, OH

All 35 PJM queue filings in Union County, OH.

Other PJM queue substations in Champaign County, OH

All 32 PJM queue filings in Champaign County, OH.