Church Hill substation interconnection queue
1 active project totaling 2.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Church Hill as the point of interconnection, all in Queen Anne's County, MD.
Target commercial operation dates as filed run from Sep 2012 to Sep 2015 (2 filings).
1active projects
2.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X3-066 | Church Hill Solar Farm | 69 | 2.3 | Solar | In Service | Sep 2015 |
| X3-067 | Church Hill 12kV | 12 | 0 | Solar | Withdrawn | Sep 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Queen Anne's County, MD
- Church-Wye Mills: 2 active, 21.2 MW of 2 filed
- Wye Mills: 1 active, 3.8 MW of 5 filed
- Price: 1 active, 0.8 MW of 9 filed
- Church: none active of 6 filed
- Kings Creek: none active of 6 filed
- Carville: none active of 3 filed
- Centreville: none active of 3 filed