Church-Wye Mills substation interconnection queue
2 active projects totalling 21.2 MW in the PJM queue.
2active projects
21.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-032 | Pondtown Solar 2 | 138 | 13.6 | Solar | In Service |
| AB2-153 | Pondtown Solar 2 | 138 | 7.6 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.