Church-Wye Mills substation interconnection queue

2 active projects totalling 21.2 MW in the PJM queue.

2active projects
21.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-032 Pondtown Solar 2 138 13.6 Solar In Service
AB2-153 Pondtown Solar 2 138 7.6 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.