Woodstock substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI1-112 Woodstock 69 kV 69 50 Hybrid Withdrawn
AE2-342 Woodstock Solar 69 26.8 Solar Withdrawn
AI2-192 Woodstock 69 kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.