West Mingo substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-421 West Mingo 69 kV 69 40 Hybrid Withdrawn
AH1-422 West Mingo 69 kV 69 18.9 Hybrid Withdrawn
AH1-423 West Mingo 69 kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.