Carville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-619 Carville 138 kV 138 102.5 Solar Withdrawn
AH1-620 Carville 138kV 138 45.6 Solar Withdrawn
AD2-076 Concho Solar I 138 18.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.