Wye Mills substation interconnection queue
1 active project totaling 3.8 MW in the PJM queue, plus 4 with terminal status (shown grayed).
5 PJM queue filings name Wye Mills as the point of interconnection, all in MD.
Target commercial operation dates as filed run from Nov 2013 to Jun 2017 (4 filings).
1active projects
3.8active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-185 | Wye Mills 25kV | 25 | 5.6 | Solar | Withdrawn | Jun 2017 |
| Y1-079 | Wye Mills Solar Site | 69 | 3.8 | Solar | In Service | Jul 2016 |
| Y1-081 | Wye Mills 12kV | 12 | 1.3 | Solar | Withdrawn | Nov 2013 |
| AC1-224 | Wye Mills 25kV | 25 | 0 | Battery | Withdrawn | Feb 2017 |
| AE1-048 | Wye Mills 25 kV | 25 | 0 | Battery | Withdrawn | n/r |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Queen Anne's County, MD
- Church-Wye Mills: 2 active, 21.2 MW of 2 filed
- Church Hill: 1 active, 2.3 MW of 2 filed
- Price: 1 active, 0.8 MW of 9 filed
- Church: none active of 6 filed
- Kings Creek: none active of 6 filed
- Carville: none active of 3 filed
- Centreville: none active of 3 filed
Other PJM queue substations in Talbot County, MD
- Easton-Trappe Tap: 1 active, 63 MW of 2 filed
- Easton: 2 active, 10 MW of 2 filed