Wye Mills substation interconnection queue

1 active project totaling 3.8 MW in the PJM queue, plus 4 with terminal status (shown grayed).

5 PJM queue filings name Wye Mills as the point of interconnection, all in MD.

Target commercial operation dates as filed run from Nov 2013 to Jun 2017 (4 filings).

1active projects
3.8active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB2-185 Wye Mills 25kV 25 5.6 Solar Withdrawn Jun 2017
Y1-079 Wye Mills Solar Site 69 3.8 Solar In Service Jul 2016
Y1-081 Wye Mills 12kV 12 1.3 Solar Withdrawn Nov 2013
AC1-224 Wye Mills 25kV 25 0 Battery Withdrawn Feb 2017
AE1-048 Wye Mills 25 kV 25 0 Battery Withdrawn n/r

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Queen Anne's County, MD

All 45 PJM queue filings in Queen Anne's County, MD.

Other PJM queue substations in Talbot County, MD

All 16 PJM queue filings in Talbot County, MD.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first