Church substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 6 with terminal status (shown grayed).
6 PJM queue filings name Church as the point of interconnection, all in MD.
Target commercial operation dates as filed run from May 2011 to Nov 2027 (6 filings).
Transmission owner as filed: DPL (1 filing).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-281 | Church 138 kV | 138 | 50 | Battery | Withdrawn | Nov 2027 |
| AF2-109 | Church 69 kV | 69 | 10 | Battery | Withdrawn | Oct 2022 |
| W3-061 | Church 69kV | 69 | 7.6 | Solar | Withdrawn | May 2011 |
| Z2-097 | Church | 25 | 3.5 | Solar | Withdrawn | Sep 2019 |
| V4-039 | Church | n/r | 3.4 | Solar | Withdrawn | Jun 2011 |
| Z1-081 | Sunfish Solar Project | 25 | 2.3 | Solar | Withdrawn | Jul 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Queen Anne's County, MD
- Church-Wye Mills: 2 active, 21.2 MW of 2 filed
- Wye Mills: 1 active, 3.8 MW of 5 filed
- Church Hill: 1 active, 2.3 MW of 2 filed
- Price: 1 active, 0.8 MW of 9 filed
- Kings Creek: none active of 6 filed
- Carville: none active of 3 filed
- Centreville: none active of 3 filed
Other PJM queue substations in Kent County, MD
- Chestertown: 1 active, 19.8 MW of 3 filed
- Massey: none active of 3 filed