Centreville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AB1-161 Centreville 12kV 12 0 Solar Withdrawn
AC2-160 Centreville 12kV 12 0 Solar Withdrawn
Y3-095 Centreville 12kV 12 0 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.