Centreville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Centreville as the point of interconnection, all in Queen Anne's County, MD.
Target commercial operation dates as filed run from Sep 2013 to Dec 2017 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB1-161 | Centreville 12kV | 12 | 0 | Solar | Withdrawn | Aug 2016 |
| AC2-160 | Centreville 12kV | 12 | 0 | Solar | Withdrawn | Dec 2017 |
| Y3-095 | Centreville 12kV | 12 | 0 | Solar | Withdrawn | Sep 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Queen Anne's County, MD
- Church-Wye Mills: 2 active, 21.2 MW of 2 filed
- Wye Mills: 1 active, 3.8 MW of 5 filed
- Church Hill: 1 active, 2.3 MW of 2 filed
- Price: 1 active, 0.8 MW of 9 filed
- Church: none active of 6 filed
- Kings Creek: none active of 6 filed
- Carville: none active of 3 filed