Substation Scout

Price substation interconnection queue

1 active project totaling 0.8 MW in the PJM queue, plus 8 with terminal status (shown grayed).

9 PJM queue filings name Price as the point of interconnection, all in Queen Anne's County, MD.

Target commercial operation dates as filed run from Jul 2017 to Oct 2024 (9 filings).

1active projects
0.8active MW
9total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-586 Price 69 kV 69 18.6 Solar Withdrawn Jun 2024
AC1-220 Price 25kV 25 15.5 Solar Withdrawn Sep 2018
AF2-313 Price 69 kV 69 12.7 Solar Withdrawn Aug 2021
AG2-295 Price 25 kV 25 9.3 Solar Withdrawn Oct 2023
AH1-253 Price 69kV 69 9.3 Solar Withdrawn Oct 2024
AB2-063 Price 69kV 69 7.6 Solar Withdrawn Dec 2018
AB1-162 Price 69 kV 69 6.3 Solar Withdrawn Jul 2017
AI2-211 Price 25 kV 25 2.6 Solar Withdrawn Mar 2023
AF1-259 Church Hill Solar 25 0.8 Solar In Service Sep 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Queen Anne's County, MD

All 45 PJM queue filings in Queen Anne's County, MD.