1 active project totalling 0.8 MW in the PJM queue, plus 8 with terminal status (shown greyed).

1active projects
0.8active MW
9total filed
Queue IDProjectkVMWResourceStatus
AG2-586 Price 69 kV 69 18.6 Solar Withdrawn
AC1-220 Price 25kV 25 15.5 Solar Withdrawn
AF2-313 Price 69 kV 69 12.7 Solar Withdrawn
AG2-295 Price 25 kV 25 9.3 Solar Withdrawn
AH1-253 Price 69kV 69 9.3 Solar Withdrawn
AB2-063 Price 69kV 69 7.6 Solar Withdrawn
AB1-162 Price 69 kV 69 6.3 Solar Withdrawn
AI2-211 Price 25 kV 25 2.6 Solar Withdrawn
AF1-259 Church Hill Solar 25 0.8 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.