East Sidney-Quincy substation interconnection queue

3 active projects totalling 86.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
86.4active MW
5total filed
Queue IDProjectkVMWResourceStatus
AI2-242 East Sidney-Quincy 138 kV 138 63 Solar Withdrawn
AE2-206 Clearview Solar I 138 41.6 Solar In Service
AG2-216 East Sidney-Quincy 138 kV 138 25.9 Solar Active
AF1-078 Clearview Solar I 138 18.9 Solar In Service
AG2-004 East Sidney-Quincy 138 kV 138 8.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.