East Sidney-Quincy substation interconnection queue
3 active projects totalling 86.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
86.4active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-242 | East Sidney-Quincy 138 kV | 138 | 63 | Solar | Withdrawn |
| AE2-206 | Clearview Solar I | 138 | 41.6 | Solar | In Service |
| AG2-216 | East Sidney-Quincy 138 kV | 138 | 25.9 | Solar | Active |
| AF1-078 | Clearview Solar I | 138 | 18.9 | Solar | In Service |
| AG2-004 | East Sidney-Quincy 138 kV | 138 | 8.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.